AIA Wisconsin Home

 

 

 

 

 

AIA Contract Documents
Change Order - Construction Manager-Adviser Edition (with instructions)

Number: G701/Cma
Series: Doc G-Series
Member Price: $37.50 (50 Sheets per unit)
Non-Member Price: $50.00 (50 Sheets per unit)


Description

G701™CMa-1992 is for implementing changes in the Work agreed to by the owner, contractor, construction manager adviser, and architect. Execution of a completed G701™-2000 indicates agreement upon all the terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and Contract Time. It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete description of the change. The major difference between G701™CMa and G701™ is that the signature of the construction manager adviser, along with those of the owner, architect, and contractor, is required to validate the change order.

 

Browse More in G Series | Back to AIA Contract Documents Main

AIA Crest
©2014 AIA Wisconsin. All Rights Reserved.
(608) 257-8477 | Privacy Policy | Contact Us
Members Area | Events Calendars | Wisconsin Architects Foundation | Contact Us